Your are here:Home | News&Events | Local News | Content

Categories

Yiwu Railway Bus Station put into service

Source: Yiwu sourcing agent    Author: Helan      Date: 2008-09-08

Passengers can go straight to the waiting hall of the railway station through the over-bridge which connects the waiting hall ,ticket hall and the waiting area of the bus station .
The bus station has ten waiting platforms, every two as one pair,each platform with signs of bus route and number striking to passengers' eyes . The over-bridge is a special way for people to go between the train station and the bus station . Passengers can walk upstairs to the flyover after getting off the bus, which brings great convenience to people .
It is introduced that the newly-built railway bus station is mainly composed of waiting canopy ,flyover and office construction . The large waiting canopy has two parts , one is for passengers in departure station and terminal, and the other is for transit buses .
Both the ten waiting platforms and the overpass manifest humanity design . Passengers could go straightly to the second floor of the railway station through the flyover . Besides, many details also show the people-oriented design idea . For example ,in the entrance-exit area is a super large bus direction board which clearly lists the lines ,passing stops and time
of buses to some important places like International Trade Mart (Line No. 801),Nanfang Passenger Transport (Line No . 803),
Jiangdong Passenger Transport (Line No . 805),Dongzhou Huayuan (Line No. 802), Exhibition Center (Line No . 804), and Nanfang Passenger Transport.



Prev:Trial operation to start in new furniture market   Next:Yiwu 40,000 subsidies to promote energy-saving lamps