Source: Yiwu sourcing agent Author: Helan Date: 2012-01-10
January 5, Pu Jiang-Yi wu road after three years of construction opened to traffic.
To Yiwu River Road is the "Jinhua highway and waterway transportation construction plan," one connection in "Eight high eight fast twelve connection", is the Zhejiang city Group Rapid channel, the provincial key construction projects.
The project began with the Hua Qiang Tou village, Punan Street, Pujiang, is connected with Highway 47, pass the eight village, three village, mountain thrush, Wang village, Qi village and white water dock located in Yiwu, across Hangzhou-Jinhua-Quzhou Expressway, Zhejiang-Jiangxi Railway, connecting the Yiwu Railway Station, the end is Yiwu Airport Road, total length 13.61 km. Pu Jiang section 9.062 km long, use first level technical standards for highway design, the design speed of 80 km / h, two-way six-lane. The road is located a separate tunnel (length 655 meters left hole, right hole length 646 m), width rank the first in Jinhua, , a total investment of 310 million. Project started in December 2008.
The opening of Pu Yi road strengthens economic cooperation of two cities, speed up the integration of Zhejiang Pujiang.
Prev:Credit record of enterprises concerned are accessible at any time Next:Yiwu Union Convey Greetings to More Than 300 Workers in Difficulty